Our Role

We prepare, the certification body certifies

We prepare the documentation and procedures; the certification body or notified body audits and issues the certificate.

Step 01

Analysis and preparation

Delphin Control: documents, procedures, qualifications.

Step 02

Audit and assessment

Certification body or notified body.

Step 03

Certificate

Issued by the certification body.

NDT qualified personnel: UNI EN ISO 9712 - SNT-TC-1A - UNI 11931:2024

Welding inspector: CSWIP

Welding coordinator: UNI EN ISO 14731

ISO 9001 Certified Company

Structures & Welding Quality

EN 1090 and ISO 3834: structures and welding quality

For metal fabrication workshops and structure manufacturers that need to CE-mark their products or demonstrate a welding quality system.

Pressure Equipment

PED: pressure equipment directive

What it is

The Pressure Equipment Directive (PED, 2014/68/EU) sets the requirements for the design, manufacture and conformity assessment of pressure equipment, so that it can be sold and used in the European Union with CE marking.

When it applies

Categories

Equipment is classified into four categories (I to IV) based on pressure, volume or diameter and the type of fluid it contains. The higher the category, the more the notified body is involved and the stricter the requirements on design, welding, inspection and documentation.

What we can do

Technical Documentation

Technical and quality documentation

We prepare the documents your customer or certification body asks you to deliver:

We carry out the non-destructive testing ourselves and include it directly in the documentation.

In-Service Plants

Plant integrity

Through a network of specialised laboratories and partners, we help you know the condition of plants and equipment in service, how long they can keep running and where it pays to intervene, while you keep a single point of contact. The results of our non-destructive testing feed directly into these assessments.

Mechanical integrity programmes

Organising inspections, testing and maintenance of vessels, piping and tanks, to keep them safe over time.

Fitness-for-service assessments

When a defect or damage is found, we assess whether the equipment can keep operating safely, under what conditions and for how long.

Risk-based inspection (RBI)

An inspection plan built on the risk of each piece of equipment, to focus testing and resources where they are needed.

Corrosion management

Identifying and monitoring corrosion mechanisms and thickness loss, with a plan to limit them.

Other Services

ISO 9001, 2D drawing and 3D modeling

Through a network of specialised consultants, we also support you in other areas, while you keep a single point of contact.

ISO 9001

Support in setting up your quality management system and preparing for the certification audit. Delphin Control is itself ISO 9001 certified.

2D Drawing and 3D Modeling

2D technical drawings and 3D models of components and structures, based on surveys or existing documentation, to support design, inspection planning and asset records.

Our Process

How we work

(01)
Initial analysis

We review the applicable standards, customer requirements and your existing documentation.

(02)
Action plan

We agree on the documents to prepare, responsibilities and timing.

(03)
Preparation

We draft documentation and procedures.

(04)
Internal review

We check that documents & records are complete and consistent before the audit.

(05)
Audit support

We assist you in dealing with the certification body or notified body.

Not sure which test you need? Just ask.

Describe the part, the required standard and where it is located: we will reply with an inspection proposal or point you to the right partner for advanced methods.