Workshop NDT for bridge construction

  • Home
  • /
  • Workshop NDT for bridge construction
Project Overview
Civil and infrastructure

Category :

Non-destructive testing during fabrication

A corten steel bridge, about 60 m long and 11 m wide, built in the workshop in sections to be assembled on site. Delphin Control inspected the construction of the main sections before they were sent to site for final assembly.

The problem

Ensuring the quality of the welds of the main sections before final assembly on site.

What we did
  • Visual inspection of 100% of the welds.
  • Magnetic particle testing (MT) on about 20% of the welds.
  • Ultrasonic testing (UT) for internal defects on about 100% of the tension joints (loaded in tension) and 50% of the compression joints.

Material: Corten steel

The result
  • Main sections inspected in the workshop before reaching the site.
  • 11 interventions over about 2 months.
  • Final relation with all the NDT report and traceability of the inspected joints.